Production

A revisit to the house/ flat is made to repeat the actual measurements to confirm it with drawings received in the factory.

Material Sourcing:
  • De Align emphasizes quality in its material selection, sourcing materials that are durable, sustainable, and aesthetically appealing.
  • They work with trusted suppliers to ensure the timely procurement of materials that fit the project budget and quality standards.
Construction Documents:
  • The production team prepares the final construction documents, which include every technical detail the contractor will need to execute the project.
  • These documents serve as the guide for material takeoff, cost estimation, and scheduling.
Pre-Production Review:
  • Before beginning on-site work, De Align conducts a thorough review of all designs and plans with contractors and construction teams.
  • This ensures that any potential issues are identified and resolved in advance, minimizing delays or cost overruns during the execution phase.
Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare